Japan Data Center Council’s Facilities Standard (Optional ones)

As reported in my previous blog, Japan Data Center Council (JDCC) has developed a comprehensive set of criteria for evaluating a data center. In the previous blog, I translated and showed the required set of evaluation items. In this blog, I do the same for the optional set. All the background and assumptions are as in here.

  - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - -  
Strategies for Deploying Blade Servers in Existing Data Centers
- – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - – - -
Categories No. Evaluation item Tier-1 Tier-2 Tier-3 Tier-4 Remarks
Location 1 Ground stability Pl extremely high or high but w/o any measure Pl extremely high or high but w/o any measure Pl extremely high or high & w/ appropriate measure Pl low w/ appropriate measure
2 Risky surrounding areas, such as fire, hazardous, bad access route for recovery No measure even in risky area No measure even in risky area Measure exists or not in risky area Measure exists or not in risky area
Building 1 Equipment earthquake-proof level Belongs to earthquake-proof Class B Belongs to earthquake-proof Class B IT-proof class A

Important eq. A

Average eq. B

IT-proof class A

Important eq. A

Average eq. B

Less than earthquake level 6: weak
Belongs to earthquake-proof Class B IT-proof class A

Important eq. A

Average eq. B

IT-proof class A

Important eq. A

Average eq. B

IT-proof class S

Important eq. A

Average eq. A

More than earthquake level 6: strong
2 Readiness for recovery from earthquake Not ready Not ready Ready Ready
3 Fireproof No requirements No requirements Fireproof Fireproof
Server room and data storage room 1 Fireproof & fireproof division No requirements Independent fireproof division > 1 hour fireproof > 1 hour fireproof
2 Room in front of server room No requirements No requirements No requirements Need requirements
3 Fire detection server room No requirements Required Required Required
4 Gas-based fire control No requirements No requirements Required Required
5 Water leak detection No requirements Required Required Required
Security 1 Access control site No requirements No requirements No requirements Human or IC card
2 Building No requirements No requirements Human or IC card: biometrics Human or IC card: biometrics
3 Server room IC card IC card IC card IC card + ten key or biometrics
4 Rack No requirements No requirements Key-based Key based or IC card: biometrics
5 Monitoring site No requirements No requirements No requirements Human or camera, sensor
6 Building No requirements No requirements Human or camera (recording or monitoring only) Human or camera (recording and monitoring)
7 Server room Camera (recording only) Camera (recording only) Camera (recording and monitoring Camera (recording and monitoring)
8 Rack No requirements No requirements No requirements Camera (row-based)
Electrical infrastructure 1 Electrical room, UPS division No requirements No requirements Independent division Independent division
2 Server room lighting redundancy Commercial only Commercial only Commercial & self generation Commercial & self generation
3 Power failure supported by UPS No requirements 5 minutes 5 minutes 10 minutes
4 Oil store No requirements 12 hours 24 hours 48 hrs. (24 hours if higher voltage)
5 Central monitoring redundancy No requirements No requirements Required Required
HVAC 1 Mechanical room division No requirements No requirements Independent division Independent division
2 Water store No requirements 12 hours 24 hours 48 hours
3 Power redundancy No requirements No requirements Self-generation Self-generation w/ possible UPS
4 Pipe redundancy No requirements No requirements Required Required
Networking 1 MDF & networking room division No requirements No requirements Independent division Independent division
2 MDF & networking room redundancy No requirements No requirements Required Required
3 Networking equipment redundancy No requirements No requirements Required Required
4 Power redundancy No requirements No requirements Required Required
5 Separation between networking and power cables No requirements No requirements Required Required
Management 1 Overall energy management No requirements No requirements Implemented
Zen Kishimoto

About Zen Kishimoto

Seasoned research and technology executive with various functional expertise, including roles in analyst, writer, CTO, VP Engineering, general management, sales, and marketing in diverse high-tech and cleantech industry segments, including software, mobile embedded systems, Web technologies, and networking. Current focus and expertise are in the area of the IT application to energy, such as smart grid, green IT, building/data center energy efficiency, and cloud computing.

, , , ,

No comments yet.